Commercial Construction Principles QUIZ #1Commercial Construction PrinciplesQUIZ #1
quiz_1.docx
Unformatted Attachment Preview
NEW SCHOOL OF ARCHITECTURE & DESIGN
CM 302
Commercial Construction Principles
QUIZ #1
Name:
BRING TO CLASS COMPLETED ON THE 24TH OF OCTOBER
1. Name some differences, regarding the interior construction, between residential and commercial
construction.
4 pts
2. Name four activities take place during the Preconstruction Phase?
a)
b)
c)
d)
4 pts
3. Your construction site needs to move 12,000 cubic yards of dirt on the site to create a balanced
site (no import or export required). List the grading equipment you will need to accomplish this.
6 pts
Quiz 1
1
Total Points this sheet
4. Your boss asks you to develop the required work (scope) for the building envelop. When you
review the drawings what specific items & materials will you look at?
6 pts
5. In preparation of grading for your site what would you plan for?
4 pts
6. Why is having a survey on your project so important before you start grading and construction?
4 pts
7. You are selected as the project manager for a new 5-story steel frame building. For your
assignment you are asked to build a plan. What items would you include in your plan?
6 pts
8. What are the four general Construction Types for commercial construction?
a)
b)
c)
d)
Quiz 1
4 pts
2
Total Points this sheet
9. Name four activites that take place during the project Close-out Phase.
a)
b)
c)
d)
4 pts
10. What is the importance of soil borings? [Check all that apply]
To determine the water table
Confirm existing HAZMAT soil
To determine the types of soils
Verify any flood plan activity
4 pts
11. In addition to verifying existing soil conditions on your site, what other information will you want
to obtain from the civil and geotechnical engineers?
4 pts
12. On your site, the grading subcontractor has uncovered and removed many large boulders. He
has stockpiled them and is ready to have them removed from the site. What type of truck will he
used to remove the boulders from the site?
4 pts
13. What is does CSI stand for in Commercial Construction Practices?
Contractor Standards of Interiors
Construction Safety Institute
Construction Specification Institute
Verify any flood plan activity
4 pts
Quiz 1
3
Total Points this sheet
14. Name three soil types and describe that soil.
a)
b)
c)
6 pts
15. You have been instructed to develop a SWPPP Plan. What do you need to consider?
6 pts
16. All utility trenches are required to be shored.
[true or false]
2 pts
-end-